"How long does it take to get custom kitchen cabinets installed on a renovation or new-build project?"
On most kitchen renovation or new-construction jobs, custom cabinetry is the single biggest lead-time item on the schedule, and general contractors need a realistic number to build their timeline around. From final measurement and design approval to delivery and installation, a fully custom kitchen typically takes six to ten weeks, depending on cabinet style, finish, and hardware selections. Because everything is built to order rather than pulled from stock, box sizes, filler panels, and appliance cutouts can be matched exactly to field conditions, which reduces change orders once cabinets arrive on site. Ordering early, ideally as soon as the layout is locked and rough plumbing and electrical are set, keeps installation from becoming the bottleneck on punch-out day. Working with a local Miami and South Florida workshop instead of an out-of-state supplier also shortens lead times and makes it far easier to resolve field adjustments quickly during the build.
Serving Miami-Dade, Broward, and all of South Florida. We'll get back to you within 24 hours.
Request a Free Quote